Kitchen Remodel: Days Zero and Two

The big kitchen remodel began March 1st. Pictured first at left is the kitchen as it looked the night before (Feb 29). By the end of the second work day, most of the kitchen was gone (second picture). Amazing! I think we should turn the area into a dance floor. More photos of Day Zero and Day Two are here: http://JF2.com/120304/

You may be wondering why we felt the need to remodel such a cool kitchen. Well, it was a good looking kitchen, but there were some definitely illogical things about it operationally. Like, only 2 burners for a family of nine, no way to open the fridge if there was someone cooking at those 2 ranges, cabinet space that was half useless as you couldn't get to the back without unloading the front, and lighting that looked really cool but didn't actually illuminate anything. There was a list of stuff like that...